News

August 13, 2020
What are the differences between EPS moulding Made in China VS Made in Canada?

What are the differences between EPS moulding Made in China VS Made in Canada? Product Description Made In Canada Made In China Selection of Profiles Each manufacturer has its own profile therefore limited of selection. Any profile required can be customized. Foam Core Denser Less dense Coating Higher glue content Less glue content Thickness Thinner […]

Read More
August 13, 2020
How to Install Limestone Balustrade Staircase

How to Install Limestone Balustrade Staircase Layout the balustrades and make sure they are evenly spaced at both ends then install the posts on both ends of the deck or property Place the post and glue the bottom edge with polyurethane construction adhesive or it is for stopping the concrete infill from leaking out.  Make […]

Read More
August 7, 2020
How to Prepare & Install Exterior Limestone Tile:

Attention: Most of the limestone tile sold are in natural finish, and sealer is needed to be applied after installation.  Some of the products are pre-sealed as the installer needs to check if the bonded side are also pre-sealed.  If sealer is on, you must grind off the sealer and roughen the whole surface before […]

Read More
August 6, 2020
How to Install Architectural Mouldings

How to Prep & Install Architectural Moulding. For Composite Exterior & Interior Mouldings: The final approach is to surround the window on all four sides as close as possible to the frame of the window or door.  The following steps are the common practices: Caulk the space between the scratch coat & the window frame, […]

Read More
Priority One Moulding is a dedicated company that focuses on quality and services to meet our customer needs.
It has the latest cutting edge tools along with state of the art CNC foam cutting machinary available. 

Copyright ¬© 2020  All Right Reserved
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram